摘要
通过有关检算,结合我单位有关施工经验,确定现浇箱梁满堂支架施工方案。经实践检验,完全满足施工需要。
Through related examines calculated that unifies my unit related construction experience,definite cast-in-place box Liang full house support plan of construction.After the practice examination,meets the construction needs completely.
出处
《改革与开放》
2009年第5X期132-133,共2页
Reform & Openning
关键词
现浇箱梁
满堂
检算
施工
The cast-in-place box Liang full house examines calculates the construction