摘要
本文针对预应力钢束张拉及压浆施工专项技术,经过大量的施工实践,对其完整的操作流程总结出的注意事项和施工要点。
This article ties Zhang La and the mud jacking construction special technology in view of the pre-stressed steel, undergoes the massive construction practice, summarizes the matters needing attention and the construction main point to its complete operation flow.
出处
《改革与开放》
2010年第5X期86-87,共2页
Reform & Openning
关键词
预应力钢束制作
张拉计算
压浆
施工注意要点
pre-stressed steel ties the manufacture to open pulls the computation mud jacking construction to pay attention to the important points