摘要
实施建筑工程施工工序活动质量监控应分清主次,依靠完善质量体系和质量检查制度,切实实现工程的最优化。基于此,本文对建筑工程质量控制的措施进行了探讨。
The implementation architectural engineering construction working procedure active mass monitoring should distinguish clearly primary and secondary, depends upon the consummation quality system and the quality testing system, realizes the project optimization earnestly. Based on this, this article has carried on the discussion to the architectural engineering quality control's measure.
出处
《改革与开放》
2010年第5X期93-93,共1页
Reform & Openning
关键词
建筑工程
质量控制
措施
Architectural engineering Quality control Measure