期刊文献+

地震高烈度区尾矿坝抗震有限元分析 被引量:5

Seismic finite element analysis on tailings dam in high seismic intensity area
下载PDF
导出
摘要 尾矿坝是矿山开采的重要设施,位于地震高烈度区的尾矿坝,其安全性极为重要。以郭家沟尾矿坝为例,对位于高烈度区的尾矿坝进行了抗震稳定性分析。通过建立三维有限元模型,对固定边界和粘弹性边界条件下的计算结果进行比较。结果表明:(1)在静力工况下,坝体沉降符合实际规律,变形值自上而下呈层状分布,库区顶部中间区域沉降量最大;(2)尾矿坝加速度响应随着坝高增高而增加,堆积坝顶部最大,呈现"上大下小"的特征;(3)位于高烈度区的郭家沟尾矿坝坝坡满足抗震稳定要求。研究成果为高烈度区尾矿坝抗震措施提供参考。 As an important facility for mine exploitation,the safety of tailings dam is very important in high seismic intensity area.By taking Guojiagou Tailings Dam as the study case,the seismic stability analysis of tailings dam located in high intensity area is carried out herein.Through the establishment of a 3-D finite element model,the calculation results obtained under the conditions of both the fixed boundary and viscous-spring boundary are compared.The result shows that:(1) the settlement of the dam body accords with the actual law and the deformation value is stratifiedly distributed from the upper to the lower with the maximum settlement occurred within the middle area of the top of the tailings reservoir;(2) the acceleration response of the dam increases along with the increase of the height of the dam and the maximum value occurs at the crest of the tailings stacked dam with a feature of large at the upper and small at the lower;(3) the dam slope of Guojiagou Tailings Dam located in a high seismic intensity area can meet the relevant requirement of seismic stability.The study result can provide a reference for the seismic measures of the tailings dam within high seismic intensity area.
出处 《水利水电技术》 CSCD 北大核心 2017年第2期45-49,55,共6页 Water Resources and Hydropower Engineering
基金 国家自然科学基金项目(51209076) 水利部公益性行业科研专项经费项目(201001035)
关键词 地震高烈度区 尾矿坝 动力响应 抗震措施 稳定性 有限元分析 邓肯—张模型 high seismic intensity area tailings dam dynamic response seismic measures stability finite element analysis Duncan-Chang Model
  • 相关文献

参考文献11

二级参考文献116

共引文献829

同被引文献42

引证文献5

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部