期刊文献+

基于主变PT二次回路升压试验的调试问题分析 被引量:2

Problems Analysis Based on the Secondary Circuit Voltage Test of the Main Transformer Voltage Transformer Commissioning Problem
下载PDF
导出
摘要 某2×600MW煤机电厂调试过程中,对#1主变电压互感器进行二次回路升压试验,试验期间发现第三个绕组的空开MCB9未合,却在其下口产生电压。经过多组加量分析后,发现问题并进行消缺,整改后对第三个绕组再次进行二次回路升压试验,试验结果正确无误,保证了调试进程。 In the process of commissioning a 2*600MW Coal - fired power plant, The secondary circuit voltage test of # 1 main transformer voltage transformer was carried out. During the test it was found that the vacuum switch MCB 9 of the third winding was not closed,but A voltage is generated at the non-charged side of the switch. After a number of experimental analysis, the problem was found and solved. The secondary circuit voltage test of # 1 main trmasformer voltage transformer is carried out again. The test results are correct, ensuring the commissioning process.
出处 《发电与空调》 2017年第1期51-53,共3页
关键词 电气调试 电压互感器 二次回路 electrical commissioning voltage transforme secondary circuit
  • 相关文献

参考文献5

二级参考文献4

共引文献18

同被引文献16

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部