期刊文献+

地铁车站冗余多联空调系统分析及设计

Analysis and Design of Subway Station Redundancy VRV Air Conditioning System
下载PDF
导出
摘要 本文主要以昆明地区地铁的地下车站车站设备管理用房通风空调系统(小系统)为对象,介绍小系统中使用变频多联空调作为冗余系统的设计理念,分析以往设计中所遇到的问题及得失经验总结,并举例介绍了地铁车站冗余多联空调系统的设计。 Taken Kunming subway station underground station equipment management room ventilation and air conditioning system (small systems) as the object, the design philosophy of small systems use frequency conversion VRV air-conditioning as a redundant system was introduced. The problems encountered in the previous design and the solutions was analyzed, and an example to introduce the design of subway station redundancy VRV air-conditioning system was given.
出处 《建筑热能通风空调》 2017年第3期63-65,共3页 Building Energy & Environment
关键词 昆明地铁 地下车站 多联空调 冗余系统 Kunming rail transit, underground station, VRV air conditioning, redundancy system
  • 相关文献

参考文献2

二级参考文献13

  • 1董哲生.空调水系统阻力计算及水泵选型若干问题[J].暖通空调,2006,36(9):45-47. 被引量:19
  • 2陆耀庆.实用供热空调设计手册[M]2版.北京:中国建筑工业出版社,2008.
  • 3铁道第二勘察设计院.深圳地铁3号线工程扩大初步设计设计原则与技术要求【R】.2005.
  • 4铁道第二勘察设计院.深圳地铁3号线施工图技术要求通风与空调【R】.2006.
  • 5铁道第二勘察设计院.深圳地铁3号线施工图技术要求低压配电【R】.2006.
  • 6铁道第二勘察设计院.深圳地铁3号线综合监控施工图设计说明【R].2009.
  • 7铁道第二勘察设计院.深圳地铁3号线通信施工图设计说明【R】.2009.
  • 8铁道第二勘察设计院.深圳地铁3号线信号施工图设计说明【R】.2009.
  • 9铁道第二勘察设计院.深圳地铁3号线西延段通新岭站通风空调施工图[R].2008.
  • 10铁道第二勘察设计院.深圳地铁3号线通风空调系统施工图设计说明[R].2008.

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部