4EASTMAN C. BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contrac- tors[ M]. NY : John Wiley and Sons,2008:93 - 113.
5ERNSTROM B, HANSON D. The constructors guide to BIM[ M]. New York: AGC of America,2005:23 -25.
6Vanlande R, Nicolle C, Cruz C.IFC and building life- cycle management [J].Automation in Construction_, 2008,18(1):70-78.
7National Institute of Standards and Technology[EB/ OL]. http://www, nist. gov,2013-10-09.
8Umit Isikdag, Jason Underwood. Two design patterns for facilitating buildinginformation model-based syn- chronous collaboration[J].Building Information Model- ing and Collaborative Working Environments, 2010, (19):544-553.
9Kyuman Cho,Taehoon Hong,Changtaek Hyun. Integratedschedule and cost model for repetitive construction process [ J ].Journal of Management in Engineering. 2010 ( 26) : 78 -88.
10Emad Elbeltagi,Mahmoud Dawood. Integrated visualized timecontrol system for repetitive construction projects [ J ].Automation in Construction, 2011 (20) : 940 - 953.