基于均衡拉动的DAM产品族精益生产改善研究 被引量:1

Research on Lean Production-Kaizen of DAM Product Family Based on Balanced Pull
下载PDF
导出
摘要 针对X-DAM的生产系统,通过其物与信息流动图发现生产过程中存在的问题,依据精益生产的思想和原则,提出了基于均衡拉动的改善方法.运用生产改善实践,缩短了X-DAM的过程周期,降低了在制品库存数量,提高了设备换产效率,使得生产过程更加稳健和安定,能及时应对需求的波动. For the product system of X-DAM, plenty of problems and waste in the product process was found by depicting the present material and information flow diagram. Therefore, according to the ideas and principles of lean production, a kaizen method based on balanced pull was proposed. By the application of the kaizen method, the lead time of the X-DAM was shortened, the number of in-process inventory was reduced and the equipment productivity exchange of dies was improved as well. What's more, the production process has also become more robust and stable, and can cope with the fluctuations of demand in time.
作者 张大伟
出处 《成组技术与生产现代化》 2017年第1期11-15,62,共6页 Group Technology & Production Modernization
基金 国家自然科学基金资助项目(51475291) 国防基础科研计划资助项目(A1120131044) 国防技术基础计划资助项目(JSBZ2014210B007 JSZL2014210B001)
关键词 定拍工序 后补充拉动生产 快速换产 DAM产品族 pacemaker process, replenishment pull systems SMED DAM product family
  • 相关文献

参考文献5

二级参考文献25

  • 1郭伏,张国民.工作研究在流水线平整中的应用[J].工业工程与管理,2005,10(2):120-124. 被引量:73
  • 2兰秀菊,陈勇,汤洪涛.SMT生产线平衡的持续改善方析[J].工业工程与管理,2006,11(2):109-111. 被引量:49
  • 3蒋美仙,金寿松,冯定忠,鲁建厦.我国机械制造企业的单件流应用研究[J].工业工程与管理,2006,11(5):107-111. 被引量:8
  • 4范中志,张树武,孙义敏.基础工业工程[M].北京:机械工业出版社,1994:53-55,213-220.
  • 5门田安弘.新丰田生产方式[M].保定:河北大学出版社,2008:21-37,72-84,276-336.
  • 6齐二石,霍艳芳.工业工程与管理[M].北京:科学出版社,2011.
  • 7Yang Chang lin, Chuang Shan ping, Huang Rong hua. Manufacturing e- valuation system based on AHP/ANP approach for wafer fabricating in- dustry [ J ]. Expert Systems with Applications, 2009, 36 : 11369-11377.
  • 8Henry C C. Streamingmaterial flow in flexible manufacturing system: a lesson in simplicity [ J ] . The International Journal of Production Re- search, 1992, 30(7) : 1483-1499.
  • 9Ruhland M. Making the case for lean manufacturing: streamlining opera- tion can help finishers improve product quality and trim the costs at the same time[ J] . Metal Finishing, 2006,106(12) : 15-18.
  • 10加藤功,阿特·斯莫利.丰田持续改善法--改善的六个步骤[M].李晓宇,译.北京:人民邮电出版社,2012.

共引文献57

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部