摘要
针对水平变位较大的高桩码头,尽管其主要构件受损率较高,但经加固修复并通过合理的试验论证,完全可以表明其适用性,在生产实践中发挥它应有的潜力。
The high-level pile wharf with a large horizontal deformation can be used really through repairing and testing, although the damaged rate of the main structural member is higher.This kind of wharf should bring all potentialities into full play in the practice, and make good effects to enterprise.
出处
《中国港湾建设》
1998年第4期41-44,共4页
China Harbour Engineering
关键词
高桩码头
受损构件
试验方案
主要结论
high-level pile wharvies damaged structural member testing plan main results