摘要
在合成氨装置冰机故障需停车检修时,进行工艺调整,保持合成气压缩机及合成回路降低负荷运行,分析论证认为方案可行,实施后效果良好,增加了一定的经济效益。
During maintenance of refrigerator while its malfunction shutdown in synthetic ammonia plant,the process was readjusted to keep the synthetic gas compressor and synthetic loop operating under lower load. The scheme was verified to be feasible after execution,bringing a quite fair economic benefit.
出处
《大氮肥》
CAS
2017年第1期40-43,67,共5页
Large Scale Nitrogenous Fertilizer Industry
关键词
冰机
分子筛
合成回路
refrigerator
molecular sieve
synthetic loop