摘要 鉴于采用弃风惩罚因子在风电系统动态经济调度中存在的问题,引入动态惩罚因子,提出了一种新的电力系统动态经济调度模型——风火协调优化调度模型,并基于实际电力系统的风电场有功出力和负荷数据,在IEEE30节点系统中对计及动态惩罚因子的风火协调优化模型进行仿真模拟。结果表明,优化模型在有效降低风电场弃风量的同时,可减少系统的总成本。 In consideration of the problems of dynamic economic dispatch of wind power system with wind curtailment penalty factor, dynamic penalty factor was introduced, and a new dynamic economic dispatch model of power system (coordinated optimal scheduling model of wind-thermal system) was presented. Based on the actual data of the active wind power and the load, case studies were carried out on the IEEE30 system as benchmark. Results show that the proposed model can reduce the wind curtailment and the total cost simultaneously.
出处 《水电能源科学》 北大核心 2017年第4期213-216,共4页 Water Resources and Power
关键词 风电场 动态惩罚因子 弃风 协调优化调度 wind farm dynamic penalty factor wind curtailment coordinated optimal operation
  • 相关文献

参考文献3

二级参考文献63

  • 1高德宾,李群,金元,于骏,张健男.东北电网风电运行特性分析与研究[J].电力技术,2010(2):33-37. 被引量:19
  • 2周劼英,张伯明,尚金成,何南强,姚佳,范斗,程满,王丹,李予州,刘明松.河南电网实时调度系统若干功能与算法[J].电力系统自动化,2006,30(2):99-104. 被引量:25
  • 3Ronan D, Eleanor D, Mark O'. System operation with a significant wind power penetration[C]. IEEE Power Engineering Society General Meeting, Denver, 2004.
  • 4Holttinen H. The impact of large scale wind farm integration in nordic countries[D]. Espoo, Finland: HelsinkiUniversity, 2004.
  • 5Holttinen H. Hourly wind power variations in the Nordic countries[J]. Wind Energy, 2005, 8(2): 173-195.
  • 6Ronan D, Mark O. A new approach to quantify reserve demand in systems with significant installed wind capacity[J]. IEEE Trans on Power Systems, 2005, 20(2): 587-595.
  • 7Holttinen H. Impact of hourly wind power variations on system operation in the Nordic couna'ies[J]. Wind Energy, 2005, 8(2): 197-218.
  • 8Goran M, Davor B. Impact of wind power plants on power system operation in Croatia[C]. International Conference on clean Electrical Power, Gapri, 2007.
  • 9Eriksen P B, Ackermann T, Abildgaard H, et al. System operation with high wind penetration[J]. IEEE Power and Energy Magazine, 2005, 3(6): 65-74.
  • 10Hadi B, Luo Changling, Boon T O. Impacts of wind power minute-to-minute variations on power system operation[J]. IEEE Trans on Power Systems, 2008, 23(1): 150-160.