随着桥梁建设规模的逐渐扩大,而高墩施工作为桥梁建设施工的难点,其混凝土施工技术成为施工重点问题。现结合耳海河特大桥高墩混凝土施工案例,阐述了高墩施工混凝土泵送技术。
With the gradual expansion of bridge construction scale,the concrete construction technology of high pier as a difficulty in the bridge construction becomes the key construction issue.According to the high pier concrete construction of Erhai River Bridge,the article sets forth the high pier construction concrete pumping technology.
出处
《城市道桥与防洪》
2017年第4期175-176,共2页
Urban Roads Bridges & Flood Control
关键词
高墩
混凝土
泵送
浇筑
拌合
high pier
concrete
pumping
pouring
mixing