500kV输电线路铁塔地线顶架横担主材高空更换作业 被引量:1

Altitude Replacement of Crossarm Main Materials in Tower Ground Line on 500kV Transmission Line
下载PDF
导出
摘要 介绍了输电线路铁塔地线横担主材等塔材高空更换方法及施工步骤。将该方法应用于某500kV线路铁塔地线顶架横担主材更换工作中,实际应用情况表明,与传统检修方法即在地面进行更换的方式相比,该方法可有效提高作业效率,缩短线路停电时间,减少施工所需投入的人力物力。 The altitude replacement method and its construction steps of crossarm main materials on tower ground lines were introduced. The actual use in the repair works of a 500 kV overhead line tower grounding crossarm main materials indicated that this replacement method could effectively improve the efficiency of construction, compared with the traditional repair methods (repaired on the ground). It could shorten the line outage time and reduce the construction investment of manpower required.
出处 《内蒙古电力技术》 2017年第1期51-53,共3页 Inner Mongolia Electric Power
关键词 500KV输电线路 铁塔地线 横担 高空更换 耐张塔 500 kV transmission line tower ground line crossarms altitude replacement strain tower
  • 相关文献

参考文献3

二级参考文献14

共引文献24

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部