摘要 某220kV变电站110kV线路零序过流保护误动,分析其原因为:该线路间隔L3相电流互感器接线盒入口处破皮,造成二次回路两点接地,同时系统发生接地故障,最终导致该线路零序过流保护误动。针对以上原因,从基建改造、日常维护、设备巡视等方面提出整改措施。 Analyzed the causes of a 110 kV line zero-sequence protection maltunctioning in the 220 kV substation. The cable was broken at the entrance of junction box on the line bays of the L3 phase current transformer, resulted in the two-point grounding on the secondary circuits, and a ground fault in the primary system occured, which eventually led to the zero-sequence overcurrent protection malfunctioning. Thus, put forwad corresponding rectification in measures from capital construction and transformation, daily maintenance,and equipment patrol.
机构地区 乌兰察布电业局
出处 《内蒙古电力技术》 2017年第1期88-91,共4页 Inner Mongolia Electric Power
关键词 零序过流保护 误动 二次回路 零电位接地网 两点接地 zero-sequence overcurrent relay malfunction secondary circuit zero potential grounding grid two-point grounding
  • 相关文献

参考文献4

二级参考文献8

共引文献32

同被引文献27

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部