摘要
湖南新宁天花坝水电站的电气设备以及附属设施存在严重的老化现象,从发电的可靠性和供电的经济性两方面,电气一次设备都有改造的必要性,文章对本次改造中的电气主接线方案以及主设备选型进行了比较。
This paper analyses the ageing problem of the electrical equipment and its auxiliaries in Tianhuaba Hydroelectric Station, and illustrates the necessity of primary electrical equipment reform in terms of reliability of power generation and economy of power supply. The comparison between different electrical wiring designs and the comparison between different models of main equipment are also covered in this paper.
出处
《安徽电气工程职业技术学院学报》
2017年第1期51-54,共4页
Journal of Anhui Electrical Engineering Professional Technique College
基金
安徽省教育厅质量工程项目(项目编号:2015sxzx05)
安徽电气工程职业技术学院科研项目(项目编号:2015ybxm05
2015zdxm06)
关键词
水电站
电气一次
改造
设计
hydroelectric station
primary electrical equipment
reform
design