摘要 近年,我国高速铁路客运专线施工迅速发展,高速铁路的行车时速达到300 km/h,这也对铁路线下施工提出更为严格的要求。郑西铁路客运专线是国内第一条修建在湿陷性黄土地区的铁路客运专线。对铁路黄土隧道施工过程控制进行简述,特别针对湿陷性黄土隧道洞内采用桩基处理软土地基,地表偏压进行卸载处理,隧道施工中围岩监控量测的应用等问题通过实例进行分析。可为其他类似工程施工提供参考。 In recent years, the construction of high speed railway for passenger traffic is developing rapidly. The travelling speed for high speed railway reaches 300 km/h, which needs a stricter standard for construction of railway lines. Zhengzhou-Xi'an high speed railway for passenger traffic is the first railway built on collapsible loess area. This paper briefly introduces the construction control of tunnels on loess area. Aiming at tunnels on collapsible loess area, pile foundation is adopted for soft foundation inside the tunnel. Unbalanced soil pressure is addressed by unloading. And supervision and measure of surrounding rock in tunnel construction is also analyzed through actual examples. The research results are of some referential value for similar projects.
作者 侯旭
出处 《石家庄铁路职业技术学院学报》 2017年第1期45-51,共7页 Journal of Shijiazhuang Institute of Railway Technology
关键词 湿陷性黄土 大断面 隧道施工 Collapsible loess Large section Tunnel construction
  • 相关文献

同被引文献8

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部