龙滩水力发电厂监控系统主控层优化与实现 被引量:1

Optimization and Achievement of Main Control Layer for the Monitoring System of Longtan Hydropower Plant
下载PDF
导出
摘要 针对监控系统硬件设备与软件技术已逐渐不能满足现场使用的功能与性能要求的现状,龙滩水电厂于2016年对监控系统主控层进行整体优化改造,通过总结近十年的维护管理经验,在原有的功能基础上,开发创新出很多独特的软、硬件功能,解决了旧系统中存在的诸多问题。 Because the hardware and software of the monitoring system in Longtan Hydropower Plant has been unahle to meet the status quo of functional and performance requirements, the main control layer of monitoring system is optimized and transformed in 2016. Based on the summarization of maintenance and management experiences in past 10 years, some new and unique hardware and software functions are developed for the monitoring system, and many problems of old monitoring system are also solved.
出处 《水力发电》 北大核心 2017年第4期44-47,共4页 Water Power
关键词 监控系统 主控层 优化改造 龙滩水电厂 monitoring system main control layer optimization and transformation Longtan Hydropower Plant
  • 相关文献

参考文献1

二级参考文献2

共引文献20

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部