期刊文献+

龙滩水电站AGC负荷调节异常探讨 被引量:1

Discussion on Abnormal Load Regulation of AGC in Longtan Hydropower Station
下载PDF
导出
摘要 龙滩水电站作为南方电网重要的调峰调频电厂,其自动发电控制(AGC)的安全性能对电网及发电厂的安全稳定至关重要。对龙滩电厂一次自动发电控制(AGC)的负荷异常调节情况进行了测试与深入剖析,提出AGC程序的负荷分配策略,不适用在"造成AGC调节异常满足的条件"工况下运行,因此策略需在原有逻辑不变的基础上针对该特殊情况作出进一步优化。 As an important peak and frequency modulation power plant in China Southern Power Grid, the safety performance of Automatic Generation Control (AGC) of Longtan Hydropower Station is vital importance to the safety and stability of Grid and power plant. The abnormal load regulation of AGC in Longtan Hydropower Plant is tested and analyzed, and it believed that the load distribution strategy of AGC is not suitable for operation under the conditions that caused abnormal AGC regulation. So the load regulation of AGC need to be optimized for solving above problem without changing the original logic of load regulation of AGC.
作者 李善鹏
出处 《水力发电》 北大核心 2017年第4期58-60,78,共4页 Water Power
关键词 一次调频 二次调频 自动发电控制 龙滩水电厂 primary frequency modulation secondary frequency modulation automatic generation control Longtan Hydropower Plant
  • 相关文献

参考文献2

二级参考文献2

共引文献6

同被引文献15

引证文献1

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部