通过利用原有变换气脱硫和精脱硫设备进行扩能改造,在保证系统安全稳定运行的情况下,达到了提高负荷,增加产量的目的。
By using original shifted-gas desulfuration and fine desulfurization equipment to revampe capacity expansion, the loadand production were increased under the condition of safe and stable operation of the system.