摘要
低温管道的施工大多需要较长的周期,因此会经历季节交替使温差较大,施工工艺也十分复杂。为了尽可能地保障施工质量,采取有效的管理措施十分必要。以低温管道系统施工特点为基础,对提高施工质量以及有效的管理措施进行论述。
The construction cycle cryogenic pipe mostly takes longer, it will experience seasonal temperature difference is large, the construction process is very complex, as far as possible in order to guarantee the quality of construction, to take effective measures is very necessary.On the basis of the construction characteristics of cryogenic pipeline system, this paper discusses the improvement of construction quality and effective manazement measures.
出处
《化工设计通讯》
CAS
2017年第2期192-192,共1页
Chemical Engineering Design Communications
关键词
低温管道
施工质量
措施
low temperature pipeline
construction quality
measures