摘要
淤泥方量的预算是河道清淤工程进行的前提,关系到工程的费用和方案选优,其计算要精确、符合实际。淤泥方量的常见计算方法有断面法、DEM数字高程模型法、方格网法、区域土方量平衡法和平均高程法等。本文以方格网法为例,探讨其在象湖清淤方量计算中的作用。
The budget of silt amount is the premise of dredging engineering, it is related to the optimal selection of engineering cost and its calculation scheme. The calculation must be precise and consistent with the actual situation. The common methods of calculating the amount of silt are section method, DEM digital elevation model method, the grid method, the regional earthwork balance method and the average height method. This paper takes the method of square grid as an example to discuss the dredging of volume calculation of Xiang Lake.
出处
《价值工程》
2017年第9期145-147,共3页
Value Engineering
关键词
清淤
数据采集
方格网法
方量
dredging
data acquisition
grid method
volume