分析了济青高铁邹淄特大桥1-144 m简支拱拱肋拼装工程的重难点,从拱肋支架与定位架加工安装、拱肋吊装、临时加固、焊接、合龙等方面,阐述了拱肋拼装的总体方案,达到了快速拼装、精确定位的效果。
This paper analyzed the difficulties of 1-144 m simply supported arch rib assembling engineering of Zouzi super bridge of Jiqing highspeed railway,from the arch rib bracket and positioning frame process installation,arch rib hoisting,temporary reinforcement,welding,closure and other aspects,elaborated the general scheme of arch rib assembling,achieved rapid assembling,positioning effect.
出处
《山西建筑》
2017年第7期161-162,共2页
Shanxi Architecture
关键词
简支拱桥
拱肋
拼装方案
定位架
simply supported arch bridge
arch rib
assembling scheme
positioning frame