期刊文献+

长沙梅溪湖国际文化艺术中心幕墙BIM技术应用 被引量:10

The Curtain Wall BIM Technology Application of Changsha Meixi Lake International Culture and Art Center
下载PDF
导出
摘要 随着BIM技术在国内的推广应用,大型公共建筑基本上采用了不同深度的BIM应用^([1])。本文主要介绍了长沙梅溪湖国际文化艺术中心幕墙工程在深化设计阶段、加工阶段、施工阶段和运维阶段的全生命周期BIM技术应用。通过BIM技术应用,解决了幕墙深化设计难度大、加工精度要求高、施工安装管理难、运营维护难度大等难点,实现了幕墙工程的智慧建造。 With the domestic popularization and application of BIM technology,the large public buildings basically used the different depth of BIM applications[1]. This article mainly introduces the application of BIM technology in Changsha Meixi Lake International Culture and Art Center of curtain wall engineering project in design development stage,processing stage,construction stage and operational stage of the whole life-cycle. Through the application of BIM technology,solved the difficulties of curtain wall design development,high machining accuracy requirements,construction and installation management as well as the operation and maintenance,finally realized intelligent construction of the curtain wall project.
出处 《土木建筑工程信息技术》 2017年第1期1-6,共6页 Journal of Information Technology in Civil Engineering and Architecture
关键词 BIM 幕墙 深化设计 施工 BIM Curtain Wall Design Development Construction
  • 相关文献

参考文献5

二级参考文献18

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2刘兆峰,徐进.无线射频识别(RFID)技术及其应用探讨[J].山东机械,2005(6):39-41. 被引量:10
  • 3Ali Motamedi and Amin Hammad. Lifecycle management of facilities components using radio frequency identification and building information model[J]. Journal of Information Technology in Construction, 2009 (14) : 238-262.
  • 4National Building Information Model Standard Project Corn-mittee, http ://www.buildingsmartalliance.org/index.php/nbims/ faq/.
  • 5Goedert, J. D., Meadati, P. Integrating construction process documents into Building Information Modeling[J]. Journal of Construction Engineering and Management,2008,134 (7) : 509-516.
  • 6朱艾路,谷芳,黄俭.RFID技术在混凝土质量检测中的应用[C].“全国混凝土新技术、新标准及工程应用”学术交流会,2010:363-368.
  • 7Pavan Meadati, Javier Irizarry, Amin K. Akhnoukh. BIM and RFID integration: A pilot study[C]. Advancing and Integrat- ing Construction Education, Research & Practice. Cairo, E- gypt: Proceedings of the Second International Conference on Construction in Developing Countries,2010:570-578.
  • 8WEI SHI. Framework for integration of BIM and RFID in steel construction[D]. University of Florida, 2009.
  • 9Xie, H., Shi, W., Issa, R. R. A. Implementation of BIM/RFID in computer-aided design-manufacturing- installation pro- cess[C]. IEEE Computer Society, Chengdu, China, 2010: 107-111.
  • 10A.M.ASCE, Farrokh Jazizadeh, et.al. Application areas and data requirements for BIM-Enabled facilities manage- ment[J]. Journal of Construction Engineering and Manage- ment, 2012 ( 138 ) : 431-442.

共引文献688

同被引文献63

引证文献10

二级引证文献62

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部