摘要
浙江音乐学院校区建设项目采用"专-兼职"结合模式进行绿色施工管理,根据节能与能源利用、节材与材料资源利用、节地与土地资源保护、节水与水资源利用及环境保护等内容,合理设置绿色施工管理目标,并采取相应绿色施工技术措施。最后进行项目施工期绿色管理效益分析,以期为同类项目提供借鉴。
Combined full-time and part-time service mode was adopted for green construction management in Zhejiang Conservatory of Music construction project. Reasonable green construction management target was established and relevant green construction technical measures were adopted according to energy and resource utilization, material and water saving and utilization, land saving and conservation, and environmental protection, etc. Green management effect during construction was analyzed to provide references for similar projects.
出处
《建筑技术》
北大核心
2017年第4期421-423,共3页
Architecture Technology
关键词
绿色施工
新建校区
夏热冬冷地区
green construction
newly-built campus
hot summer and cold winter zone