6Lambregts,K.; Van Wilgen,P.; Chakraborty,M..Improvement of production scheduling by closing the loop with MES[J].Steel Times International,2006,5(30):24-25.
7Shahid,Ikramullah Butt; SUN Houfang,et al.Verification of production activity control architecture using PETRI net tools[J].Information Technology Journal,2007,6(6):924-928.
8罗伟钊.生产作业管理[M].广东:广东经济出版社,2006.
9Yano C A, Rachamadugu R. Sequencing to minimize work overload in assembly lines with product options[J]. Manage. Sci. , 1991,37: 572 - 586.
10Miltenburg G J . A theoretical basis for scheduling mixed model production lines[J]. Mgmt Sci, 1989, (35): 192 -207.