摘要
徐庄煤矿7199工作面回采期间发生特大老塘涌水,多次涌水量超过300m^3/h,最大涌水量达到540m^3/h。为确保工作面能够正常回采,根据工作面实际情况研究制定出该套防治水方案,保证了涌水期间工作面的正常回采,取得了很好的经济及社会效益。
Large water inrush occurred during mining goaf in Xuzhuang Coal Mine Working Face 7199 times,water inflow of more than 300m^3/h,the maximum water inflow reached 540m^3/h.In order to ensure the normal mining working face can,according to the actual situation of the research work to develop the water prevention and control program,to ensure the normal mining water inflow during the working face,has achieved good economic and social benefit.
出处
《世界有色金属》
2017年第3期123-123,125,共2页
World Nonferrous Metals
关键词
老塘涌水
综放俯采
防治水
煤水分离
goaf water
caving down mining
water control
coal water separation