本文就某燃气电厂发电机交接试验过程中发现发电机定子绕组受损的过程及处理办法进行了分析,对主要设备在监造、出厂、交接试验中的注意事项及其必要性提出一些看法。
In this paper, the author analyzes the process of the generator stator winding damage and the treatment method in the process of generator transfer test in the generator power plant. The paper puts forward some views on the matters needing attention and the necessary of the supervision, manufacture and commissioning test.
出处
《内燃机与配件》
2017年第2期89-91,共3页
Internal Combustion Engine & Parts
关键词
发电机
定子绕组
世漏电流
交接试验
generator
stator winding
leakage current
hand over test