期刊文献+

温度效应对全直桩现浇梁板高桩码头结构的影响 被引量:1

Thermal effect on vertical piled and cast-in-situ deck wharf
下载PDF
导出
摘要 针对温度效应对全直桩现浇梁板高桩码头的影响问题,在75、150、200、300 m等4个不同长度的结构段上增加温度效应后对内力的影响进行对比和论述,采用国际通用有限元软件进行三维空间计算,得出国内环境下适当增长结构段长度可对桩基、纵横梁的弯矩、剪力和轴力值均有一定程度的降低。 Aiming at the thermal effect on the vertical piled and cast-in-situ deck wharf, comparing inner force results due to the different length(75,150,200,300 m) of structure segment with additional thermal action based on 3D dimension calculation by international finite element software,the results reveal that the internal forces such as bending moment,shear force,axial force of pile foundation and deck elements can be significant reduced by the appropriate growth of segment length plus the effect of thermal actions.
作者 刘洋 苗辉
出处 《水运工程》 北大核心 2017年第4期84-88,共5页 Port & Waterway Engineering
关键词 全直桩现浇梁板高桩码头 温度效应 结构分段长度 有限元计算 vertical piled and cast-in-situ deck wharf thermal effect structure segment length finite element calculation
  • 相关文献

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部