期刊文献+

1、2号吸收塔浆液起泡溢流的原因分析及解决办法

Cause analysis and solution of foaming overflow in No.1 and No.2 absorption towers
下载PDF
导出
摘要 大唐长春第二热电有限责任公司6台200 MW机组烟气脱硫均采用石灰石-石膏湿法脱硫技术,对其工艺而言,其核心装置为吸收塔。近期1、2号脱硫系统随机组运行相继投运,但却发生了吸收塔起泡溢流现象,并且产出的石膏颜色偏黑,石膏饼上黏附一层黑色物质,类似于粉煤灰颜色,严重影响了石膏品质。本文就吸收塔起泡溢流的原因及解决办法进行了分析及探讨。 The flue gas desulfurization of six 200 MW units of Datang Changchun No. 2 Thermal Power Co.,Ltd. adopts limestone-gypsum wet desulfurization technology,and its core device is absorption tower. Recently,No. 1 and No. 2desulfurization systems have been put into operation,but there occurs the phenomenon of foaming overflow,and the output of the gypsum is partial black with black material,which has seriously affected the quality of gypsum. In this paper,the causes and solutions of foaming overflow in absorption tower are analyzed.
作者 刘金凤
出处 《黑龙江科学》 2017年第4期154-155,共2页 Heilongjiang Science
关键词 湿法烟气脱硫 吸收塔 起泡溢流 Wet flue gas desulfurization Absorption tower Foaming overflow
  • 相关文献

参考文献3

二级参考文献12

共引文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部