基于WBS-RBS法的民机项目研制风险识别 被引量:1

Risk Identification of the Civil Aircraft Project Development Based on WBS-RBS Method
下载PDF
导出
摘要 有效快速地识别出项目风险对民机项目研制意义重大。本文选用WBS-RBS法,以量化的形式生成项目风险识别矩阵,通过对民机项目研制的RBS与WBS进行耦合分析,对民机项目研制风险进行识别,以期全面、有效地掌控民机项目研制风险。 To efficiently identify the project risk has a great significance to civil aircraft project development.This paper uses WBS-RBS method to build the project risk identification matrix in the form of quantification,and by the coupling analysis of RBS and WBS developed by the civil aircraft project,makes a project risk identification,in order to fully and effectively control the aircraft project development risk.
作者 向艳
出处 《价值工程》 2017年第12期58-59,共2页 Value Engineering
关键词 WBS-RBS 耦合 民机 研制 风险识别 WBS-RBS coupling civil aircraft development risk identification
  • 相关文献

参考文献4

二级参考文献41

  • 1张维忠.控制心血管危险因素的现代概念[J].中华内科杂志,2004,43(10):721-722. 被引量:16
  • 2司书宾,孙树栋,韩光臣,王军强.基于三角模糊数的综合保障评价指标权重分析[J].西北工业大学学报,2004,22(6):689-694. 被引量:44
  • 3贾俊峰,梁青槐.WBS-RBS与AHP方法在土建工程施工安全风险评估中的应用[J].中国安全科学学报,2005,15(7):101-103. 被引量:61
  • 4张磊,向德全,胥杰.军用信息系统安全效能灰色评估模型和算法[J].空军工程大学学报(自然科学版),2007,8(1):77-80. 被引量:11
  • 5PMI. A guide to managing project risks and opportunities [M]. 4th ed. Newtown Square: Project Management Institute, 2008.
  • 6Millar R, Lessard D. Understanding and managing risks in large engineering projects [ J ]. International Journal of Project Management, 2001 , 19 (8) : 437-443.
  • 7Zou P X W, Zhang G, Wang J. Understanding the key risks in construction projects in China [J]. International Journal of Project Management, 2007, 25(6) : 601.
  • 8Lam K C, Wang D, Lee P T K, et al. Modelling risk allocation decision in construction contracts[J]. International Journal of Project Management, 2007, 25(5): 485.
  • 9Schatteman D, Herroelen W, Van de Vonder S, et al. Methodology for integrated risk management and proactive scheduling of construction projects[J]. Journal of Construction Engineering and Management, 2008, 134(11) : 885.
  • 100kmen C), 6zta A. Construction proiect network evaluation with correlated schedule risk analysis model [J]. Journal of Construction Engineering and Management, 2008, 134 ( 1 ) .. 49.

共引文献43

同被引文献9

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部