摘要
借助新奥法和新意法基本思想,采用数值模拟方法,研究了不同注浆加固圈厚度作用下,马蹄形深埋隧道围岩特征曲线及最佳注浆加固范围,结果表明:注浆加固能有效减小围岩松动压力,延迟初支支护时机,减小支护结构荷载承担比率,通过围岩反力释放率与注浆圈厚度关系可得到最佳注浆范围。
Taking the basic idea of new Austrian method and new method, using the numerical simulation method, this paper researched the sur-rounding rock characteristic curves and optimum grouting reinforcement range of horseshoe deep tunnel under different grouting reinforcement cir-cle thickness, the results showed that the grouting reinforcement could effectively reduce the surrounding rock loose pressure, delay initial sup- port time, reduce the support structure load bear ratio, through the relationship of surrounding rock anti stress release rate and grouting circle thickness could get the best grouting range.
出处
《山西建筑》
2017年第8期152-154,共3页
Shanxi Architecture
关键词
深埋破碎围岩
注浆加固
特征曲线
有限差分法
deep buried broken rock, grouting reinforcement, characteristic curve, finite difference method