摘要
以某城市轨道交通2号线工程为例,分析了该车站主体工程进度的实际完成情况,并从分阶段、差异化管理、重点监控薄弱环节、抓全进度链管理等方面,总结了该工程的进度管理经验,以供参考。
Taking the No. 2 Line project of some urban rail traffic as the example, the paper analyzes the completion of the engineering progress of the main project of the station, and sums up the progress management experience of the project from the phases, differentiated management, monitoring over weak steps, and management of the progress chain, so as to provide some reference for the research.
出处
《山西建筑》
2017年第8期235-238,共4页
Shanxi Architecture
关键词
轨道交通
工程进度
管理目标
车站
rail traffic, engineering progress, management aim, station