摘要
以恰希玛核电设备转运平台吊车梁的加工制作为例,分析了钢结构集约化制作对工程的影响,并结合钢结构特点,给出加工地点的决策方案,以保证钢结构能按量如期到达施工现场。
Taking the process and production of Chashma nuclear power equipment transport platform crane beam forexample, this paper ana-lyzed the influence of steel structure intensive production to engineering, a nd combining with the characteristics of steel structure, gave the deci-sion method of process location, to ensure the steel structure could arrive at the construction location.
出处
《山西建筑》
2017年第8期240-241,共2页
Shanxi Architecture
关键词
核电站
钢结构
加工地点
运转平台
nuclear power plant, steel structure, process location, transfer platform