摘要 公私合作制(public-private partnership,PPP)项目的股权配置直接影响着风险和收益在各项目干系人之间的分配,科学合理的股权配置决策模型对于确保项目的成功至关重要。该文首先归纳分析了PPP项目股权配置决策中各项目干系人的决策原则。根据这些原则和PPP项目融资的特点,在债权人、私人部门和公共部门三方主要项目干系人满意的约束条件下,构建了一个寻求项目社会成本最低的股权配置模型。其次,使用遗传算法对模型的最优股权配置进行了求解,并在适应度函数的计算中引入Monte Carlo模拟对项目收益和成本的关键影响因素进行了仿真,加入免疫记忆细胞提高了算法的收敛性。最后,根据某轨道交通PPP项目的案例对模型进行了验证。结果表明:该研究提出的建模与仿真方法可为类似项目中的股权配置决策提供参考。 The equity structure of a public-private partnership (PPP) project directly affects the allocation of risk and interest among the project stakeholders. A reasonable equity allocation decision making model is important for a project's success. This paper first analyzes the equity allocation decision making principles of the main stakeholders. These principles and project financing characteristic were then used to define an optimization model to minimize a PPP projects' social costs while satisfying the objectives of the key PPP stakeholders, i.e., the debtors, the private companies and the governments. A genetic algorithm is used to solve the decision making problem with a Monte Carlo model to simulate the changes in the project revenues with an immunological memory cell to improve the algorithm convergence. The model is validated by companies with an actual urban rail transport project. The model can be used to provide reference data for public and/or private entities for equity structure decision making for other PPP projects.
出处 《清华大学学报(自然科学版)》 EI CAS CSCD 北大核心 2017年第4期376-381,共6页 Journal of Tsinghua University(Science and Technology)
基金 国家自然科学基金资助项目(71572089)
关键词 公私合作制(PPP) 股权结构 遗传算法 MONTECARLO模拟 public-private partnership (PPP) equity structure genetic algorithm Monte Carlo simulation
  • 相关文献

参考文献4

二级参考文献26

  • 1胡琳琳,胡鞍钢.中国如何构建老年健康保障体系[J].南京大学学报(哲学.人文科学.社会科学),2008,45(6):22-29. 被引量:19
  • 2严玲,尹贻林.基于治理的政府投资项目代建制绩效改善研究[J].土木工程学报,2006,39(11):120-126. 被引量:48
  • 3孙慧,范志清,孙尉添.基于可能性理论和ANP方法的BOT项目投资机会评价研究[J].工业工程,2007,10(1):126-129. 被引量:4
  • 4Liou F M, Huang C P. Automated approach to negotiations of BOT contracts with the consideration of project risk[J]. Journal of Construction Engineering and Management, 2008, 134(1): 18-24.
  • 5Asian Development Bank. Technical assistance People's Republic of China: Application of public-private partnerships in urban rail-based transportation project[R]. Project Number: 39527, December 2005.
  • 6Jin X H, Doloi H. Interpreting risk allocation mechanism in public-private partnership projects.. An empirical study in a transaction cost economies perspective [J]. Construction Management andEconomics. 2008.26(7). 707-721.
  • 7Roumboutsos A, Anagnostopoulos K P. Public-private partnership projects in Greece: Risk ranking and preferred risk allocation [J]. Construction Management and Economics, 2008, 26(7): 751 -763.
  • 8EAP^3N. Public-Private Partnership in Infrastructure Development: Case Studies from Asia and Europe [M]. Weimar, Germany: EU-Asia Network o( Competence Enhancement on Public-Private Partnerships in Infrastructure Development, August 2007.
  • 9Wang S Q, Tiong R L K. Case study of government initiatives for PRC's BOT power plant project [J]. International Journal of Project Management, 2000, 18 (1) : 69 - 78.
  • 10Henk G. Privatization and the public/private partnership [ J]. Journal of Management Engineer, 1998, 14 (4) :28 - 29.