上青矿8#矿组目前采用无底柱分段崩落法回采,随开采深度下降矿体变薄、夹岩增多,造成原矿废石混入率增大。同时塌陷区地表征地困难,费用高。为解决这些问题,选择充填法与原采用的无底柱分段崩落法进行技术、指标、经济综合分析对比,同时考虑地表有大粒度干选系统,最终选择上向分层干式充填法,保证了地表生态平衡和经济效益。
No. 8 ore group of Shangqing iron mine is currently mined with non-pillar sublevel caving method. With deepening of the mining, orebody becomes thin and has an increasing amount of rocks, causing waste in-ore rate of raw ores grows high and land acquisition at subsidence area gets difficult and costly. To solve these problems, filling method and non-pillar sublevel caving method are both adopted to make comprehensive and comparative analysis from technological, index and economical perspective. Meanwhile, considering that there is a large size dry separation system on the ground and eventually upward cut and dry filling method is selected, which ensures ecological equilibrium of ground surface and good economic returns.
出处
《矿业工程》
CAS
2017年第2期16-18,共3页
Mining Engineering
关键词
废石混入率
地表塌陷
干选废石
waste in-ore rate
surface subsidence
waste rock of dry separation