期刊文献+

“十三五”期间医院停车设施建设的机遇与挑战 被引量:3

OPPORTUNITIES AND CHALLENGES FOR THE CONSTRUCTION OF HOSPITAL PARKING FACILITIES DURING THE 13TH FIVE-YEAR PLAN PERIOD
下载PDF
导出
摘要 针对医院停车设施建设,文章从政策支持、建设需求两个方面概述了停车设施建设的机遇,总结了行业共识,并分析了医院停车设施建设面临的挑战,提出了一些解决方案。 In view of the construction of hospital parking facilities, the article summarizes the opportunities of parking facilities construction from the aspects of policy support and construction demand, sums up the industry consensus and analyzes the challenges of hospital parking facilities construction, and puts forward some solutions.
出处 《中国医院建筑与装备》 2017年第4期68-70,共3页 Chinese Hospital Architecture & Equipment
关键词 医院停车设施建设 地下停车库 停车泊位 立体停车 Hospital parking facilities Underground parking garage Parking berth Three-dimensional parking
  • 相关文献

参考文献3

二级参考文献15

  • 1Merry L Wallin. LCA-A tool for marketing clean products[J]. Journal of Clean Technology and Environmental Science, 1991, 32(5) :205-213.
  • 2W Ronald Hudson. Infrastructure management: Integrating de- sign, construction, maintenance, rehabilitation, and renovation [M]. New York: McGraw-Hill Education, 1997.
  • 3Guetari R. Formal techniques for design of an information and Life-cycle management system [J]. Integrated Computer-aided Engineering, 1997(40) : 137-156.
  • 4Esselman T, Eissa M, McBrine W. Structural condition monitor- ing in a life cycle management program [J]. Nuclear Engineering and Desima, 1998(5) : 163-173.
  • 5John I Messner, Victor E Sanvido. An information model for project evaluation [J]. Engineering Construction and Architectur-al Management, 2001,8(5 ) .- 391-400.
  • 6李国军.国际项目管理[M].北京:国家行政学院出版社,2006.
  • 7Martins L L, Gilson L L, Maynad M T. Virtual team:What do we know and where we go from here? [J]. Journal of Manage- ment, 2004, 30(6):805-835.
  • 8Stuart D, Perter A Poppet.Value Engineering, the Search for Un-necessary Cost [M]. London:CIOB, 1998.
  • 9Prasad Kumar Dey. Process re-engineering for effective imple- mentation of project [J]. International Journal of Project Man- agement, 1999,17(3) : 147-159.
  • 10Love P E D, Guna Sekaran, Li A H. Concurrent engineering : A strategy for procuring construction projects [J]. International Journal of Project Management, 1998,16(6) : 375-383.

共引文献8

同被引文献15

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部