摘要
对履带起重机在风电吊装施工中,主臂+风电臂专用工况吊载偏移情况进行了探究,通过测试结合有限元计算分析了主要影响因素,可为产品的设计开发与制造提供有效指导,也为相关工程装备产品的研制提供了有益参考。
Load deviation of crawler crane was researched under the main arm + wind power arm condition in the process of wind power hoisting. The main influencing factors were analyzed through testing and the finite element method,which could provide the guidance for product design and manufacturing,and provide a reference for the development of related engineering equipment.
出处
《现代机械》
2017年第2期64-66,83,共4页
Modern Machinery
关键词
履带起重机
风电吊装
风电臂
crawler crane
wind power hoisting
wind power arm