本文以喀左县郭台子电站增效扩容工程为例,通过对电站运行效益及电站现状进行分析,论证了增效扩容的必要性和可行性。结果表明:郭台子电站增效扩容工程技术可行、经济高效,工程实施可获得良好的经济效益和社会效益。
The article takes the synergistic scale efficiency analysis of Guotaizi Power Station in Kazuo County as an example, demonstrates the necessity and feasibility of synergistic scale by analyzing therunning benefit and current situation of the power station. The result indicates that Guotaizi Power station synergistic scale engineering is technically feasible, economical and efficient, the engineering implementation can achieve well economic benefit and social benefit.
出处
《中国水能及电气化》
2017年第3期46-49,共4页
China Water Power & Electrification
关键词
郭台子电站
增效扩容
效益
分析
Guotaizi Power Station
synergistic scale
benefit
analysis