5Hobbs G K. HALT and HASS Seminar [C]. Detroit, MI, February 26, 1996. http://www.hobbsengr.com.
6Robert H, Gusciora. The Use of HALT to Improve Computer Reliability for Point-of-Sale Equipment [C]. 1998 Proceeding Annual Reliability and Maintainability Symposium, 89-93.
7David Rahe. The HASS Development Process [C]. 2000 Proceeding Annual Reliability and Maintainability Symposium, 389-394.
8Silverman M. HASS Development Methods: Screen Development, change schedule, and re-prove schedule [C]. 2000 Proceeding Annual Reliability and Maintainability Symposium, 245-247.
9Silverman M. Summary of HALT and HASS Results at an Accelerated Reliability Test Center [C]. 1998 Proceeding Annual Reliability and Maintainability Symposium, 30-36.
10Robert W D. Reliability Enhancement Testing (RET) [C]. 1994 Proc. Annual Reliability and Maintainability Sym, 91-98.