摘要
针对高含硫含湿天然气开采项目气田水综合处理工程配套设施,根据其产生的主要环境影响,拟采取的水、气处理措施与工艺,分析了气田水综合处理工程施工期和运营期的环境监理工作,强调环境监理重点为施工期地面防渗处理和污泥处置落实情况,以及运营期的环境管理和环境监测。
Analyzing environmental impact and process of water disposal and desulfurization based on a sup- plementary high sulfur gas-field water disposal station. Analyses of environmental supervision points dur- ing construction period and runtime, and emphasizing the key environmental supervision was ground seep- age during construction period and sludge disposal, as well as emergency plans and environmental monito- ring system during trial operation period.
出处
《四川化工》
CAS
2017年第2期52-54,共3页
Sichuan Chemical Industry
关键词
气田水综合处理工程
环境监理
施工期
运营期
gas-field water disposal
environmental supervision
construction period
runtime