在G市垃圾焚烧发电项目中,忽视社会因素对项目的影响、忽视利益相关者参与是导致项目建设受阻的重要因素。社会影响评价通过利益相关者分析、社会风险分析、社会影响分析和可持续性分析可以为项目提供决策依据、规避社会风险、实现项目目标、优化项目设计和提高项目社会效益。
During the construction of waste incineration power generation project in G city, the government ignores the social impact and the participation of stakeholders were important factors which lead to the stop of waste incineration power generation project. Through stakeholder analysis, social risk analysis, social impact analysis and sustainability analysis, social impact assessment can provide decision - making basis for the project, to avoid social risks, to achieve the project objectives, to optimize project design and improve social benefit.
出处
《四川环境》
2017年第2期86-90,共5页
Sichuan Environment
关键词
社会影响评价
城市建设
社会学
垃圾焚烧
Social impact assessment
urban construction
sociology
waste incineration