摘要
随着工业4.0时代即将到来,以BIM为突破口,建筑信息化革命带动了建筑构件从生成式设计到加工、安装的集成化进程。建筑模型的构件化是以参数化为基础,以数字化加工设备为基本手段的设计方式。本文探讨了利用BIM的自适应构件体系对模型构件进行自动化设计的技术流程和方法,并对以此方式实施建构设计进行案例研究。
With the imminent arrival of the industrial 4.0 era, BIM as a breakthrough, building information revolution led the building components to an integrated process from generative design, processing, to installation. The modularization of the building model is based on the parameterization and the digital processing equipment as the basic method. This paper explores the technical process and method of automating the design of the model components by using BIM's adaptive component system, and has carried out a case study on the construction design in this way.
出处
《城市建筑》
2017年第4期19-22,共4页
Urbanism and Architecture
基金
高等学校学科创新引智计划B13011资助项目