摘要
通过某高层实例,介绍了转换层支撑体系及模板加固施工技术的难点,并针对这些难点采取一些列的解决措施,取得了较好的效果。
This paper introduces the difficulties of the support system of the transfer floor and the construction technology of the template reinforcement through a high-level example. Then puts forward some solutions aimed at these problems, and achieves a good effect.
出处
《工程建设与设计》
2017年第8期15-16,共2页
Construction & Design for Engineering
关键词
高层商住楼
钢管混凝土柱
high-rise residence
concrete filled steel tubular column