摘要
通过采用新工艺、新设备,结合工程实践经验,对大厚度半幅一次成型水稳结构层摊铺的方法、施工中的质量控制以及传统工艺的比较进行探讨。
Through the use of new technology, new equipment, combined with the practical engineering experience, paper makes a comparison on the paving method of large thickness of half width one time forming of cement stabilized crushed stone layer, the construction quality control and the traditional process.
出处
《工程建设与设计》
2017年第8期152-153,共2页
Construction & Design for Engineering
关键词
公路工程
水稳
大厚度
半幅
一次成型
highway engineering
water stability
large thickness
half width
one time forming