摘要
客专调度集中(CTC)线路中,跨调度台渡线道岔的处理方案比较复杂,以佛山西站城际动走2线和客专动走3线间增设渡线道岔为例,详细说明跨调度台渡线道岔信号系统的处理方案,以满足跨调度台列车运行需求。
As far as the complication of the treatment scheme of cross-dispatcher's-contro! cross- over switch in passenger special line with centralized traffic control is concerned, a treatment scheme of the signal system for cross-dispatcher's-control crossover switch is described in detail to meet the demand of train operation across dispatcher's control by taking the addition of a cross-o- ver switch between the intercity railway's EMU running Line 2 and the PSL EMU running Line 3 at Foshan West station as an example.
出处
《铁道通信信号》
2017年第4期20-22,共3页
Railway Signalling & Communication
关键词
渡线道岔
调度集中
信号系统
Cross-dispatching switch CTC
Signal system