承台大体积混凝土温度裂缝分析及控制措施 被引量:1

Analysis and Control Measures of Temperature Crack of Mass Concrete in Pile Cap
下载PDF
导出
摘要 在四川省雅砻江两河口水电站库区复建县道X037线普巴绒特大桥承台大体积砼施工时,采取了配制低水化热的砼配合比,承台中设置水管通循环水冷却,承台外表面保温养护,养护期间严格温控等措施,避免了承台大体积砼产生温度应力裂缝。 In the large-volume concrete construction of the paclittic bridge of the rebuilt county road X037 line in the Shuanghekou Hydropower Station of the Yalong River in Sichuan Province, the concrete mix ratio of low hydration heat was taken. Water pipe is set in the cap which is access to circulating water for cooling. The outer surface of the cap has insulation conservation. There is strict temperature control during conservation. There measures have avoided the temperature stress cracks of the large concrete of the cap.
作者 刘瑞美
出处 《价值工程》 2017年第14期138-140,共3页 Value Engineering
关键词 大体积砼 砼热工计算 循环水冷却 温度监控 表面保温 large volume concrete concrete thermal calculation circulating water cooling temperature monitoring surface insulation
  • 相关文献

参考文献2

二级参考文献3

共引文献54

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部