摘要
文章在已有±800 kV特高压直流工程建设和科研成果基础上,通过优化设备选型、结合总平面布置,最终推荐安全可靠、经济合理的方案。此方案减少GIS室区域占地面积,并同时节约了GIL管道长度。在减少特高压换流站总占地面积、节约投资、保障特高压直流工程的可靠性等方面,具有积极意义。
Based on the construction and scientific study of ±800 kV UHVDC projects, this paper recommends a reliable andpractical plan through equipment selection optimization and the general arrangement. This solution reduces GIS room space andGIL pipe length. It can provide reference for similar projects in many aspects.
出处
《湖南电力》
2017年第A01期22-25,共4页
Hunan Electric Power