盾构全断面穿越玻璃纤维筋地下连续墙的施工技术 被引量:6

Construction Technology of Tunnel Shield for Full Cross-Section Passing Through Glass Fiber Reinforced Underground Diaphragm Wall
下载PDF
导出
摘要 以实际工程为例,阐述了盾构全断面穿越玻璃纤维筋地下连续墙时的施工技术。通过工程风险分析,针对性地选择复合式土压平衡盾构机,并对进出地下连续墙两侧土体进行预加固,同时在掘进过程中严格控制施工参数,最终成功地穿越地下连续墙,且控制了已有结构的沉降量。 Taking practical engineering as an example, the construction technology of tunnel shield for full cross-section passing through glass fiber reinforced underground diaphragm wall has been expounded in this paper. Through the engineering risk analysis, targeted selection of composite earth pressure balance shield machine, pre-reinforcement of soil mass in and out on both sides of underground diaphragm wall, while at the same time, the construction parameter has been strictly controlled in the tunneling process and finally a successful passing through the underground diaphragm wall has been obtained and the settlement volume of the existing structure has been controlled accordingly.
作者 韩建
出处 《建筑施工》 2017年第4期536-538,共3页 Building Construction
关键词 隧道施工 盾构设备 全断面穿越 预加固 玻璃纤维筋地下连续墙 tunnel construction shield equipment full section passing through pre-strengthening glass fiber reinforced underground diaphragm wall
  • 相关文献

参考文献6

二级参考文献43

  • 1岳鹏飞,戴泉,何炬.盾构施工下穿建筑桩基的影响研究[J].铁道标准设计,2012,32(3):77-79. 被引量:24
  • 2王虹,鞠世健.盾构穿越建筑物桩基群的施工技术[J].广东建材,2006,29(7):71-73. 被引量:14
  • 3杨自华,钟志全.泥水盾构穿越桩基础掘进施工[J].建筑机械化,2007,28(9):51-53. 被引量:13
  • 4胡俊.高水压砂性土层地铁大直径盾构始发端头加固方式研究[D].南京:南京林业大学,2012.
  • 5Fanlu Min, Wei Zhu, Shengquan Xia, et al. Test study on Airtight Capability of Filter Cakes for Slurry Shield and Its Application in a Case[ J]. Advances in materials science and engineering, 2014, 696801,1 - 8.
  • 6Fanlu Min, Wei Zhu, Xiaorui Han. Filter cake formation for slurry shield tunneling in highly permeable sand [ J ]. Tunnelling and Underground Space Technology, 2013,38:423 -430.
  • 7Fanlu Min, Wei Zhu, Cheng Lin, et al. Opening the Excavation Chamber of the Large-Diameter Size Slurry Shield: A Case Study in Nanjing Yangtze River Tunnel in China [ J ]. Tunnelling and Underground Space Technology, 2015,46 ( 2 ) : 18 - 27.
  • 8胡俊. 盾构始发端头化学加固范围的数值模拟研究[C] .四川峨眉: 第十二届海峡两岸隧道与地下工程学术与技术研讨会,2013.
  • 9胡俊,李艳荣,肖天峑,等. 一种n形地下连续墙盾构进出洞施工方法:中国,201410547255. X [P] ,2014 年 10 月 16 日.
  • 10Hu J,W a n g X , Jiang B . Numerical analysis of temperature field ofvertical frozen soil wall reinforcement at shield shaft[A] . 2014 3rdInternational Conference on Micro Nano D evices, Structure andComputing Systems ( MNDSCS 2 0 1 4 ) [C] . Singapore, 2 0 1 4 ,3 : 4 -10.

共引文献51

同被引文献27

引证文献6

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部