3BUYURGAN N,SAYGIN C,KILIC S E.Tool allocation in flexible manufacturing systems with tool alternatives[J].Robotics and Computer-Integrated Manufacturing,2004,20(4):341-349.
4KONAK A,KULTUREL-KONAK S,AZIZOGˇLU M.Minimizing the number of tool switching instants in flexible manufacturing systems[J].International Journal of Production Economics,2008,116(2):298-307.
5PRABAHARAN T,NAKKEERAN P R,JAWAHAR N.Sequencing and scheduling of job and tool in a flexible manufacturing cell[J].The International Journal of Advanced Manufacturing Technology,2006,29:729-745.
6FU Chunlin.The application of high-end turning-milling center[J].Digital Manufacturing Industry,2008(4):96-98.