期刊文献+

嘉兴市区公交票价体系的现状及推进策略研究

Research on the Current Situation and Promoting Strategies of Jiaxing Urban Public Transport Ticket Price
下载PDF
导出
摘要 随着城市建设步伐的加快,嘉兴市公交发展已由"快速增长"阶段逐步过渡到"有序发展"模式。然而嘉兴市区采取的"普惠制"公交票价体系已无法适应社会资源有效配置这一发展思路。现采用灰色关联度模型从三种备选公交票价方案中选出最优方案,进而为优化调整嘉兴市区公交票价提供思路,使有限公交资源的"有效配置"与"社会公平"两者之间达到动态平衡。 With the accelerated pace of urban construction,the model of Jiaxing urban public transport has been transformed from " rapid growth" to " orderly development". However," GSP" bus fare system adopted by Jiaxing has been unable to adapt to the development idea which aims to configure the social resources effectively. Presently,the best plan is chosen from the three bus fare options by the Grey Relational Model.What is more,it also provides ideas to the optimal adjustments of Jiaxing's bus fares,and maintains dynamic balance between the effective allocation and the social equity in limited public transportation resources.
出处 《时代农机》 2016年第11期82-83,共2页 Times Agricultural Machinery
基金 学院课题嘉兴市区公交票价体系的现状及推进策略研究的研究成果(jzyy201502)
关键词 城市公共交通 公交票价体系 灰色关联度模型 urban public transport bus fare system grey relational model
  • 相关文献

参考文献4

二级参考文献13

共引文献213

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部